Drive the most cost effective, quality controlled, on time production through key building blocks like TnA's at RFQ stage, Raw Material timing, Sample timing, Production schedules and Micro plans.
按照谈判时的时间计划、原材料时间安排、样品时间安排、生产计划和微观计划等关键模块,推动最具成本效益、质量可控和准时的生产。