Design Oversight: Manage the end-to-end design phase (from feasibility study to conceptual and basic design to detailed engineering) while ensuring it aligns with project requirements and end-user needs
设计监督:管理端到端的设计阶段(从可行性研究,到概念和基础设计到详细工程设计),确保其符合项目要求和最终用户需求
Budget Estimation & Cost Control: Prepare CAPEX budget requests, conduct feasibility studies, and apply value engineering to optimize costs without compromising quality
编制资本支出预算申请,开展可行性研究,并运用价值工程优化成本,同时保证质量
Stakeholder & Vendor Management: Coordinate cross-functional teams (engineering, procurement, and operations) and manage external partners, including architectural/engineering firms and equipment vendors
利益相关者与供应商管理:协调跨职能团队(工程、采购和运营),并管理外部合作伙伴,包括建筑/工程公司和设备供应商
Risk Management & Compliance: Identify risks early in the design phase and ensure all designs adhere to statutory regulations, HSE (Health, Safety, and Environment) policies, and industry standards
风险管理与合规:在设计阶段早期识别风险,并确保所有设计均符合法规、健康、安全与环境 (SHE) 政策以及行业标准
Develop preliminary schedules and work breakdown structures tailored to different project objectives
根据不同的项目目标,制定符合项目实施的初步进度计划表和工作分解表
Design and plan the project according to fire safety regulations and/or GxP regulations, based on different project requirements
根据不同的项目要求,根据消防法规和/或GxP法规要求进行项目的设计规划
Change Control & Handover: Manage design changes effectively, track deliverables against stage-gates, and oversee the seamless handover of the design package to construction and commissioning teams, and response to BIM model lifecycle management
变更控制与交接:有效管理设计变更,跟踪阶段性交付成果,并监督设计包顺利交接给施工和调试团队,并负责BIM模型在项目生命周期中的管理
Be responsible for arranging meetings, writing meeting minutes, following up on the implementation of meeting resolutions, supervising key tasks, and promoting the implementation of key projects
负责会议安排,撰写会议纪要,跟进落实会议决议,督办重点工作,推动跟进关键项目落地
Willingness to travel occasionally, both national and international
愿意接受国内和海外出差